Open Channel Foundation
Not Logged In |  | 
Open Channel Foundation


Quick Application Search:


DPI
Get this title!
¤ 
Get DPI
¤ 
Monitor new releases


Additional resources
¤ 
Overview Document (PDF)


Foundation :: Project Management :: DPI

DPI

Design Process Integration

DPI logo
Total downloads from Open Channel to date: 11
source code available SOURCE CODE AVAILABLE

Competitive Advantages
  • This database system methodology can be used by any design department.
  • DPI provides objective evidence of ISO 9001 design section compliance.
  • DPI enables the program to retain a critical knowledge database after personnel have retired or left the program

Design Process Integration (DPI) is a systems engineering approach using an integrated database. The goal of DPI is to provide a fully integrated knowledge-based system to control and document the design engineering process.It provides a checklist type data input forms to assure compliance with contractual requirements. It also provides a common database repository for the information behind the released design drawings.

The Design Process Integration database was created using Microsoft Access. In a larger engineering organization a more powerful database such as Oracle is recommended to perform this function. This methodology of controlling and documenting the design engineering process can be adapted by other diverse departments/organizations program-wide.


System Operation

  1. The requester enters a request for design services by submitting a Design Support Request (DSR) through the database.
  2. The cognizant design engineering manager opens and reviews the existing DSRs and assigns the DSR to specific members of the team for analysis and evaluation through the database.
  3. If the DSR is approved, it is sent to the Configuration Change Board (CCB) for funding. If the DSR is not approved, it is sent back to the requestor with disapproval rationale in a timely manner.

The following approval documents are available in Section 1.0 of the Product Approval Record (PAR) and are completed as required:

  • The Configuration Change Board Directive (CCBD)
  • The Logistics Change Board (LCB) records
  • The Engineering Design Change Proposal (EDCP)
The approval documents provide implementation direction to all functional departments.
  • Further details about System Operation are available in the overview document (PDF format).



This application was originally developed at the Kennedy Space Center
   More software from Kennedy Space Center


Open Channel Software runs entirely on Open Source Software. We return value to the Software community in the form of services and original software. Most of our content is currently available as source code, with the copyright owned by the original author, All Rights Reserved. Everything else is Copyright ©2000 - 2017 Open Channel Software.
SSL
SSL


View our privacy statement.
Contact webmaster at openchannelsoftware dot org with questions.